CyrusOne Data Center 30-day Public Comment Period June 17 through July 25, 2024

This is a 30-day public comment period for the review of CyrusOne Data Center's draft permit, technical support document, and notice of construction application with associated documents.


CyrusOne Data Center is requesting to replace two previously-permitted (but not bought or installed) 750kW emergency generators for the administrative building. These two emergency generators were not bought because of facility construction delays. When the building was ready for the emergency generators, the specific approved model was no longer available.


CyrusOne is requesting to update their air permit (“approval order”) with two newer emergency generator models of the same, manufacturer, size and output, while maintaining their permit limits and conditions.


The emissions are not the same between the previously-permitted 750kW emergency generators and the newer ones. In some areas, emissions are slightly higher and in other areas, emissions are slightly lower. Overall, emission change is small.


We determined this proposal satisfies the requirements of Chapter 173-400 WAC. The public is invited to comment.


Tentative public hearing

Date/Time: Tuesday, July 16, 2024, 6 p.m. online (webinar)


An online public hearing will be held if we determine there is significant public interest. If not significant written requests for an online public hearing are received by Monday, July 8, 2024, then the online public hearing will be cancelled.


View project documents online.


Comment period ends Thursday, July 25, 2024.



Contact Information

*Indicates Required Fields

Submitted by Value

First Name

Last Name

Address

City

State

ZIP

Email

Your Comment


Please enter your comments in the "Insert comments" space below. To submit attachments, use the "Upload a File" button. Then hit "Continue" to review your comments.


To submit comments for a group, please visit our Commenting Tips webpage.


Next steps:
After the public period ends, we will:
  • Review and respond to comments.
  • Issue the air permit.



Contact information is necessary if you want to receive future notices or responses related to this topic.

*Uploading a file is optional*

You may attach up to five 20 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx, xlsx, xls. If you experience technical difficulties submitting your comment please contact the person listed at the bottom of this page.


Thank you for subscribing to the CyrusOne Data Center 30-day Public Comment Period June 17 through July 25, 2024 mailing list.